Search By Products
search by Suppliers

CM2024Z Solar Charge Controlle...

Barrakuda | China Wholesale | China Trade

REF. QUOTE: Che180118-1
Last Updated: 09.08.13
SUPPLIER
Cheer Solar group Limited
   China
BRAND
DESCRIPTION

CM2024Z Solar Charge Controller
Features
1. Intuitionistic LED indicators show the current system battery capacity, charging and discharging state of the battery.
2. Having the protection functions as overcharging, over discharging, overload, short-circuit and reversed connection.
3. Tandem type PWM charging makes the charging efficiency increase by 3% to 6%, compared with non-PWM charging.
4. The parameters of charging and discharging have been set during the production (special parameters need to be told in advance), so no need to adjust the parameters.
5. It can set the working mode of the load.
6. USB charging function (optional).
7. Grid-complementary (optional function)
8. Remote telecommunications function equipped (optional function).
9. Prevent battery from discharging to battery at night.
Technical data
ModelCM2024Z
Rated Current20A
Rated Voltage20A
System Voltage12V/24V
Output Overload&Short-circuit protectionoutput >23A and 60s or >29A and 15s overload protection
>40A short-circuit
No load loss≤13 mA
voltage drop of charging circuit<0.2V
voltage drop of discharging circuit<0.1V
working temperature-25 to +60
elevated voltage14.4V/28.8V
Float charging voltage13.7V/27.4V
temperature compensation-4mv/cell/
low voltage disconnecting11.2V/22.4V
low voltage recovery12.6V/25.2V
charging modePWM
InstallationInstall Get ready for tools and cables. Advising you to matching the right cables. Ensure that the current density 4A/mm² that is conductive to reducing the line voltage drop. Recommendation: 30A with 10mm² cables. Check whether the installation sites compliance with the relevant safety requirements. Please avoid the damp, dusty, there is a place flammable, explosive and corrosive gases use the controller to install. Install the controller into a fixed vertical plane. See section 5 of the pore size and pore spacing. In order to ensure a good thermal control conditions, please set aside each 10cm below the controller space. As shown on the right, connect the (1) Load, (2) Battery and (3) Solar Panel to the controller according to the order of (1) (2) (3). Pay attention to the load, battery, solar panel and controller of same polarity. Put the external temperature sensor into the left of the controller (probe port). The temperature sensor should be placed at the similar space of the battery. (Otherwise, the controller will control the parameters of all wrong temperature compensation.) If you have remote monitoring and control function, please insert one end of the included communication wire on the right of the controller (communication port), the other end to connect to the host computer.
demolition:To prevent accidents, please order the demolition of solar panels, battery and load disconnect with controller.NoteBattery polarity will not damage the controller, but you will have a load equipment security risks.
ModelCM2024Z
Installtion cable area≤7# AWG (6mm²)
Operating temperature-25~60
Storage temperature-35~70
Humudity requirements≤90,no condensation
Size168 mm×88 mm×34 mm
Mounting hole spacing68 mm×159 mm --Φ4
Weight275g
We are special large scale R&D and manufactory enterprise of solar power inverter ,the global supplier of solar controller, photovoltaic system equipment . We also have passed ISO9001, CE and RoHS certifications. Our inverters can be designed and produced according to clients’ special request. Welcome to be our agents!

If any enquiry, please don’t hesiate to connect me. Thanks.

Best wishes,

Alice
e-mail/msn:sales(at)solargloble(dot)com
website: www(dot)solargloble(dot)com
 

 

OBSERVATION